What should I have ready for the first conversation?
Start with your project postcode, what you would like to change and your approximate budget and timing. Existing drawings and photographs are useful if you have them. You can also begin with a simple description of the problem you want the project to solve.
Do I need finished drawings before getting in touch?
You can get in touch at the ideas stage or when you have drawings ready. Explain where you are in the process so the next steps can be discussed. The design information needed for an initial conversation is different from the detail needed for a construction quotation.
Will my extension need planning permission?
That depends on the property and the proposal. In England, some house extensions fall within permitted development, subject to specific limits and conditions. Check with your designer or local planning authority before committing to work. The Planning Portal’s extension guidance explains the starting points.
Is Building Regulations approval the same as planning permission?
No. They are separate requirements, and a project may need both. Most extensions require Building Regulations approval, including work that does not need a planning application. Read the GOV.UK overview and check the requirements for your particular project with a building control body.
What is the difference between an estimate and a quotation?
An early estimate gives a starting point based on the information and assumptions available. A quotation should describe a defined scope and its price, including any remaining allowances or exclusions. Ask what the figure covers and what could change it before making a decision.
How can I make quotations easier to compare?
Give builders the same drawings and specification, then compare their inclusions, exclusions, allowances and VAT treatment. Ask about differences before comparing the final totals. Our quotation guide sets out a useful checklist.
Can I stay in the house during building work?
This depends on the scope and site arrangements. Consider access, temporary kitchen or bathroom facilities, dust, noise and the separation of living areas from the work. Discuss these practical arrangements when reviewing the proposed programme.
How are changes during a build dealt with?
Agree the process before work starts. A change should be described clearly, with its effect on price and programme understood and recorded before proceeding. Confirm who can authorise changes and how the updated scope will be documented.